Update July 30: A great report with photos of the operation has been provided to DXMAPS by David. You can view it in PDF format.
About 1280 QSOs in 8 days
About 361 grid squares, 119 outside Europe
Many OSOs with Japan: 302
Highlights:
• US, ZL and VK
• Heard a station from YI (Iraq
• Egypt
• Many QSOs with J, HL, B
Update July 10: David updates that he has arrived at the mountains and today he should be climbing there. Weather is stable, rain, wind and cool, but stable.
Update July 8: David got in touch with DXMAPS to confirm that he has arrived in 4L. All luggage has arrived and weather looks good.
David, DL7ZM, will be in Georgia from July 10 to July 18 at 2700 m asl. Call sign 4L/DL7ZM.
Antenna (hope) 2 x 6 element + Ground Plane
Active at 6m and 144m (some yagi)
Power: I hope to be able to power 300 W from solar cell and wind generator. This will depend on my ability to bring 3 car batteries up the mountain.
Preferred mode is CW!
73 David OE6NZM / DL7ZM / AD0PY
|